Construction is now gathering pace at Eight Gardens with the cranes towering over the Watford skyline.
Building S6 is up to level 8 with building S3 currently decking out level 2 and the foundations progressing on building S5. Groundworks for the other 3 buildings are due to start soon and we look forward to the podium construction early in 2023 which will combine 4 of the buildings together.
Still a way to go before the tallest building tops out at level 27!
DECEMBER 2022