KEW BRIDGE ROAD PHASE 2

The 2nd phase of the redevelopment of the former Thames Water reservoir consists of 3 residential blocks, 9, 6 and 5 storeys, linked by a ground floor car park.

There were many challenging aspects to the project including shallow existing services and a 3m diameter Thames Water Ring main running through the site at depth which required a ground movement analysis to satisfy Thames Water.

DECEMBER 2016