Two and a half years on and the once bear open land has now come to life with the two buildings seen here for Telford homes nearing completion (one 7 and the other 18-storeys). Our temporary works department are making the final check and preparations to allow for a safe dismantling of the tower crane with careful consideration of the mobile crane which will be positioned directly over two live 1.8m diameter sewers.
SEPTEMBER 2021