This site in Walton-on-Thames has been redeveloped to contain an industrial warehouse for CPS and a 4-storey residential block of flats for Paragon. Construction is nearing completion for the CPS warehouse with the ground bearing slab to be poured in mid-September. The congested site has made for challenging logistics particularly with the large attenuation tank required and associated drainage.
SEPTEMBER 2016